Compartment walls in the roof space
- Compartmentation
In the top storey of a care home beneath a roof, ADB asks for a compartment wall to continue through the roof space, meeting the underside of the roof covering or deck with fire-stopping and continuing across any eaves.
- Completing the line with cavity barriers above is not appropriate, and cavity barriers belong at the edges of cavities and at the junctions with compartment walls and floors.
- Where the fire-resisting construction of a protected corridor stops short of the roof, ADB asks for cavity barriers on its line or a fire-resisting ceiling of at least EI 30.
- A cavity between a roof and a ceiling is limited to 20 m in any direction.
- To limit spread over the roof, ADB asks for a 1500 mm zone either side of the wall with a covering of the class it sets on a deck of class A2-s3, d2 or better, or for the wall to extend through the roof.
Regulation 28 report 2022-0043 records the inquest jury’s findings after the Newgrange care home fire, 2017: inadequate compartmentation in the roof space let the fire spread faster than expected and the roof collapse.
Here the second floor is in the roof, so its compartment walls rise through the roof space to the underside of the deck. The roof in front of them fades while this part is open, so they can be seen.
- Along the bedroom wing the lengths of roof space between the walls, and between the last wall and the east gable, are about 16.9, 17.2 and 11.7 m, each under the 20 m of Table 9.1.
- In the service wing a cavity barrier on the line of the dining room’s south wall keeps every length under 20 m too.
- Cavity barriers are not used to complete a wall: the wall goes up to the deck.
REI 60The compartment walls between protected areas, REI 60, carry on through the roof space to the underside of the roof deck, so they keep that period there.
- GuidanceADB Vol 2, para 8.21“Compartment walls in a top storey beneath a roof should be continued through the roof space.”
- GuidanceADB Vol 2, para 8.25A compartment wall should meet the underside of the roof covering or deck, with fire-stopping to maintain the continuity of fire resistance, and be continued across any eaves.
- GuidanceADB Vol 2, para 8.26To reduce the risk of fire spreading over the roof from one compartment to another, a 1500 mm wide zone of the roof, either side of the wall, should have a covering of the class ADB sets, on a substrate or deck of a material rated class A2-s3, d2 or better.
- GuidanceADB Vol 2, para 8.29As an alternative to the 1500 mm zone, the compartment wall may extend through the roof for at least 375 mm above the adjoining roof covering where the height difference between the two roofs is less than 375 mm, or at least 200 mm where the difference is 375 mm or more or the coverings either side are of the best class.
- GuidanceADB Vol 2, para 9.3Cavity barriers should be provided at the edges of cavities, at the junction between an external cavity wall and every compartment floor and compartment wall, and at the junction between an internal cavity wall and every compartment floor, compartment wall or other fire resisting barrier.
- GuidanceADB Vol 2, para 9.4“It is not appropriate to complete a line of compartment walls by fitting cavity barriers above them. The compartment wall should extend to the underside of the floor or roof above.”
- GuidanceADB Vol 2, para 9.5Where the fire resisting construction of a protected escape route is not carried to the underside of the roof covering at the top storey, the cavity above should be fitted with cavity barriers on the line of the enclosure or enclosed on its lower side by a fire resisting ceiling (minimum EI 30) that extends throughout.
- GuidanceADB Vol 2, Table 9.1Maximum dimension of an undivided cavity in a building other than a dwelling: 20 m between a roof and a ceiling; 20 m for any other cavity with a surface of class C-s3, d2 or better, and 10 m for worse.Why it applies here: Every length of roof space between walls is under 20 m: about 16.9, 17.2 and 11.7 m along the wing, with a cavity barrier in the service wing.
- GuidanceRegulation 28 report to prevent future deaths 2022-0043, section 3The inquest jury found a fire in a care home had been started by resistive heating in electrical wiring at ceiling level in a linen cupboard, and that inadequate compartmentation in the roof space let it spread faster than expected and led to the roof collapsing. Its conclusion was an accidental fire contributed to by inadequate compartmentation in the roof space.
What a fire risk assessor checks
Hot work by contractors is carried out only under a permit to work, with the area checked afterwards
Benchmark: The 2006 guide asks for a written permit to work for hot work near flammable materials, and for the area to be checked afterwards for ignition or smouldering.
- GuidanceFire safety risk assessment: residential care premises, pages 18 and 53Areas where hot work such as welding has been carried out are checked afterwards for ignition or smouldering, and a written permit to work controls hot work near flammable materials.
Holes made for new services through fire-resisting walls and floors are fire-stopped
Benchmark: The 2006 guide says unsealed holes round services let fire and smoke spread, and that openings made through fire-resisting walls and floors are fire stopped by competent contractors. The inquest into the Newgrange care home fire, 2017, found inadequate compartmentation in the roof space (Regulation 28 report 2022-0043).
- GuidanceFire safety risk assessment: residential care premises, pages 53 and 124Unsealed holes where pipes, cables and other services pass through walls and ceilings let smoke and fire spread, and openings made by services through fire-resisting walls and floors are fire stopped by competent contractors.
- GuidanceRegulation 28 report to prevent future deaths 2022-0043, section 3The inquest jury found a fire in a care home had been started by resistive heating in electrical wiring at ceiling level in a linen cupboard, and that inadequate compartmentation in the roof space let it spread faster than expected and led to the roof collapsing. Its conclusion was an accidental fire contributed to by inadequate compartmentation in the roof space.
The roof void is not used for storage
Benchmark: The 2006 guide asks for roof voids not to be used to store combustible material.
- GuidanceFire safety risk assessment: residential care premises, page 48Voids, including roof voids, should not be used to store combustible material, and are sealed off or kept open for inspection and the removal of combustible material.